MEADOWLARK PARK & WEST MEADOWLARK PARK
163 Street from 87 Avenue to 95 Avenue
- Includes a bikeway within the existing service road and a shared use path.
- The route will connect to the new pathways being built on 95 Avenue & 87 Avenue.
Operational changes include:
- The west service road from 87 Avenue to 89 Avenue will be converted to one-lane southbound, with access off of 163 Street only.
- Speed humps will be added to the west service road, and a 30km/h speed limit will be implemented.
- The west sidewalk between 89 Avenue and 95 Avenue will be upgraded to a 3 metre wide shared pathway.
- On the west side of the 88 Avenue and 89 Avenue intersections, modifications including curb extensions will be installed.
- Bus stop #5890 will be relocated 73m to the south of 89 Avenue and 163 Street.
- Bus stops #5355 and #5687 will be consolidated and located in front of Jasper Place School.
Parking changes include:
- Permanent, minor removal of parking will be required on the west side of 163 Street. This is expected to have minimal impact to available on-street parking.
ELMWOOD
167 Street and 169 Street from Whitemud Drive to 87 Avenue
- Includes an on-street bikeway and shared use path.
- Will connect Elmwood to the Whitemud Drive pedestrian overpass and the new shared use path being constructed on 87 Avenue as part of Valley Line West LRT.
Operational changes include:
- The installation of a local street bikeway on 167 Street from 70 Avenue to 80 Avenue and introduction of traffic calming measures including speed humps and median islands. A speed limit of 30km/h will be implemented.
- Curb extensions will be installed at where 83 Avenue intersects with 167 Street and 169 Street.
Parking changes include:
- Permanent, minor removal of parking in front of the breezeway entrance at the south end of 167 Street.
MEADOWLARK PARK, SHERWOOD & PARKVIEW
95 Avenue from 142 Street to 163 Street
- Includes a combination of local street bikeway, shared pathway, unidirectional and bidirectional on-street protected bike lanes.
- This route will connect to the new route on 163 Street, existing 142 Street shared roadway and the future Valley Line West LRT connection on 156 Street.
Operational changes include:
- A 30km/h speed limit will be implemented within the service roads between 163 Street and 156 Street.
- Travel for cyclists, roller bladers, scooters and other active transportation users will be westbound only on the north service road, and eastbound only on the south service road. Vehicle traffic is not impacted and will remain two-way.
- From 149 Street to 156 Street, one vehicle lane in each direction will be removed.
Parking changes include:
- Permanent parking removal on both sides of 95 Avenue between 142 Street and 148 Street.