THU PARMAR
THU PARMAR

2026 Active Transportation Network Expansion

As part of the City's 2026 Active Transportation Network Expansion, new shared-use paths and bike lanes are being installed in Ward sipiwiyiniwak. 


Find out what is happening and how it will impact you. 

DISCOVER ACTIVE PATHWAY TYPES

On-Street Protected Bike Lane

A common sight across the City, on-street bike lanes are protected from moving and parked vehicles by a physical barrier. These can be bi-directional or one-way. 

Local Street Bikeway

Streets where people who bike and people who drive share the street without separated bike infrastructure. This generally includes pavement markings and signage. 

Shared Pathway

Shared Pathway

These are paved, off-street paths that are shared by all active transportation users, including those who bike, walk, run, scoot, blade and more. Think river valley trail. 

VIEW THE MAPS (click to enlarge)

FIND OUT HOW THIS IMPACTS YOU

MEADOWLARK PARK & WEST MEADOWLARK PARK

163 Street from 87 Avenue to 95 Avenue


  • Includes a bikeway within the existing service road and a shared use path.
  • The route will connect to the new pathways being built on 95 Avenue & 87 Avenue.


Operational changes include:

  • The west service road from 87 Avenue to 89 Avenue will be converted to one-lane southbound, with access off of 163 Street only. 
  • Speed humps will be added to the west service road, and a 30km/h speed limit will be implemented. 
  • The west sidewalk between 89 Avenue and 95 Avenue will be upgraded to a 3 metre wide shared pathway. 
  • On the west side of the 88 Avenue and 89 Avenue intersections, modifications including curb extensions will be installed. 
  • Bus stop #5890 will be relocated 73m to the south of 89 Avenue and 163 Street. 
  • Bus stops #5355 and #5687 will be consolidated and located in front of Jasper Place School. 


Parking changes include:

  • Permanent, minor removal of parking will be required on the west side of 163 Street. This is expected to have minimal impact to available on-street parking. 



ELMWOOD

167 Street and 169 Street from Whitemud Drive to 87 Avenue


  • Includes an on-street bikeway and shared use path.
  • Will connect Elmwood to the Whitemud Drive pedestrian overpass and the new shared use path being constructed on 87 Avenue as part of Valley Line West LRT. 


Operational changes include:

  • The installation of a local street bikeway on 167 Street from 70 Avenue to 80 Avenue and introduction of traffic calming measures including speed humps and median islands. A speed limit of 30km/h will be implemented. 
  • Curb extensions will be installed at where 83 Avenue intersects with 167 Street and 169 Street. 


Parking changes include:

  • Permanent, minor removal of parking in front of the breezeway entrance at the south end of 167 Street.



MEADOWLARK PARK, SHERWOOD & PARKVIEW

95 Avenue from 142 Street to 163 Street


  • Includes a combination of local street bikeway, shared pathway, unidirectional and bidirectional on-street protected bike lanes. 
  • This route will connect to the new route on 163 Street, existing 142 Street shared roadway and the future Valley Line West LRT connection on 156 Street.


Operational changes include:

  • A 30km/h speed limit will be implemented within the service roads between 163 Street and 156 Street.
  • Travel for cyclists, roller bladers, scooters and other active transportation users will be westbound only on the north service road, and eastbound only on the south service road. Vehicle traffic is not impacted and will remain two-way. 
  • From 149 Street to 156 Street, one vehicle lane in each direction will be removed. 


Parking changes include:

  • Permanent parking removal on both sides of 95 Avenue between 142 Street and 148 Street.



FOR MORE INFORMATION ON THE CITY'S ACTIVE TRANSPORTATION NETWORK 

AND TO SEE COMPLETED AND FUTURE PROJECTS CLICK HERE.

amiskwacîwâskahikan ᐊᒥᐢᑲᐧᒋᐋᐧᐢᑲᐦᐃᑲᐣ

OFFICIAL WEBSITE FOR CITY COUNCILLOR THU PARMAR

WARD SIPIWIYINIWAK, EDMONTON

780-496-8120

Copyright © 2026

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept